久久超碰97人人做人人爱_日韩一区精品视频一区二区_ ,欧美无人区码SUV,国产一区二区乐插,亚洲天堂在线观看视频,精品一区二区三区无码视频 ,又黄又爽又无遮挡在线观看免费_亚洲宅男精品一区在线观看_在线观看国产一级强片_怎么看黄片

Contact Us

Inflatable Air Blower cleaning process

Date: 2015-1-5   Click: 1464 Times

Finishing "Inflatable Air Blower" must pay attention to the fan power cord and clip the button, the line to be sorted out in advance, do not let the fan run when working on the line to produce a variety of contact, the power cord is in the initial position of the fan in general (both removed available).
Adjust the position of the radiator
The radiator tune in the right place, the place "Inflatable Air Blower" level to the processor port cover side, four point deduction buckle clasp around the column (beak antennae) in the bottom of the need to align with the motherboard. The radiator tune into the right position, the fan will be placed horizontally to cover the processor port side, the four point deduction buckle clasp around the column (beak antennae) in the bottom of the need to align with the motherboard. Motherboard Intel processor buckle hole distribution in the vicinity of the CPU socket, the user can easily observe the board found. Intel original radiator have to look at before installing rotary switch is fully restored in situ. "Inflatable Air Blower" As a result of the heat sink clip clip pressed four buckle design, so the best way is to install the clip "diagonal" push installation method. Order push uneven force likely to cause the fan, causing the other two buckle pressing difficulties.

Back to: Industry news

+86-0769-83660708

Home Product News Contact