久久超碰97人人做人人爱_日韩一区精品视频一区二区_ ,欧美无人区码SUV,国产一区二区乐插,亚洲天堂在线观看视频,精品一区二区三区无码视频 ,又黄又爽又无遮挡在线观看免费_亚洲宅男精品一区在线观看_在线观看国产一级强片_怎么看黄片

Contact Us

Cross Flow Fan Installation and maintenance requirements

Date: 2016-5-13   Click: 1658 Times

1, "Cross Flow Fan" ambient temperature should be 75ºC ≥ -40ºC.
2, industrial gas through the cooling fan does not allow strong acid, alkali and various solutions.
3, does not allow dust and other debris fall into the fan, so as to avoid burning and fan blades break.
4, "Cross Flow Fan" before installation should first check whether the damage caused due to packing and shipping, deformation, if damaged or deformed should be repaired after installation.
5, and then check the "Cross Flow Fan" all parts and screws are loose; whether touching or displacement between the blade and duct before installation if the touching or the shift should be adjusted. To replace the fan products from different manufacturers, you need to measure fan site size holes.

Back to: Industry news

+86-0769-83660708

Home Product News Contact