亚洲欧美日韩另类在线一,日本一区二区三区日本免费,国 ,国产群交在线视频一级,98影院国产在线视频,女人与公拘交酡全过女免费,国产视讯美女在线播放 ,久久黄色a级电影_京东热A∨在线综合网_青青欧美一区在线播放_婷婷丁香爱丁香

Contact Us

Cross Flow Fan Installation and maintenance requirements

Date: 2016-5-13   Click: 1658 Times

1, "Cross Flow Fan" ambient temperature should be 75ºC ≥ -40ºC.
2, industrial gas through the cooling fan does not allow strong acid, alkali and various solutions.
3, does not allow dust and other debris fall into the fan, so as to avoid burning and fan blades break.
4, "Cross Flow Fan" before installation should first check whether the damage caused due to packing and shipping, deformation, if damaged or deformed should be repaired after installation.
5, and then check the "Cross Flow Fan" all parts and screws are loose; whether touching or displacement between the blade and duct before installation if the touching or the shift should be adjusted. To replace the fan products from different manufacturers, you need to measure fan site size holes.

Back to: Industry news

+86-0769-83660708

Home Product News Contact